Our integrated design process encompasses 4 stages required to create your new home – project outline, design & selections, fabrication and construction within a short 20 weeks.
PRODUCTION STAGE
Sit back, relax and pop a cold one while we get to work.
CONSTRUCTION STAGE
Your new home is growing fast, get ready to move in!
What’s involved?
Let us guide you throughout the whole process in 9 steps
The process of planning your new home can often be overwhelming, especially if this is your first time. The visual tool below outlines the next steps involved with your project.
At ecokit, we want to make this journey as much simple and smooth as possible. We will work with you throughout the whole process, from design and documentation to the construction of your home.
01
Free Consultation
01 Free Consultation
- design requirements
- level of service
- budget
- timeframe
02
Briefing
02 Briefing
- development of the briefing requirements
- a topographic survey including surrounding properties
- a geotechnical report and other relevant docs
03
Site Analysis
03 Site Analysis
- orientation, sun paths & views
- access to site
- understanding of slope
- climate zone & micro-climate
- prevailing winds
- climate risks
04
Site Plan & Schematic Design
04 Site Plan & Schematic Design
- sketch plans drawn to scale including the building envelope, sketch floor plans, boundary setbacks and outdoor spaces (holistic overview of the site)
- preliminary concept of internal layout & elevations
- consideration of options
- suggestion of external materials/color scheme
- a project budget analysis and costs breakdown
05
Contract Documentation
05 Contract Documentation
- review documents for construction
- final budget overview
- creation of project timeline
06
Design Development
06 Design Development
- interior layout, external elevations and materials selections
- all plans drawn to scale with sizes and dimensions added
- consult with authorities (regarding sewer, water, power etc)
- select all consultants (structural engineer, landscape designer, interior designer, building surveyor)
07
Preparation for fabrication
07 Preparation for fabrication
- ordering material
- digital files preparation
- liaison with manufacturer
08
Delivery
08 Delivery
- quality assurance
- logistics organisation
- tool hire
09
Post Construction
09 Post Construction
- contract adherence and defects period
Ready to talk to us?